Contact Info | Reference | Email Login | Samples | Site Map

Urban Oil Lease

Problems

  • Problems in the Amine Plant made it difficult for the operators to maintain the quality of their sales gas, risking a shut-in from their buyer.
  • Operators spent many hours trying to find the source of the problem by tweaking their system one component at a time, but quality still lagged.
  • Since most of the plant instrumentation involved pneumatic instruments connected to a local alarm panel, operators had a hard time identifying problems before they reached the alarm or shutdown stage.
  • Lack of electrical drawings, combined with a relay panel containing over 100 relays made troubleshooting motor controls difficult.
  • Lack of quality control, combined with lack of documentation caused environmental agencies to doubt claims that the lease was in compliance with environmental laws.

Solutions

  • Installed 2 new PLCs: one for safety systems and one for plant operations.
  • Replaced key pneumatic instruments with smart transmitters which communicated data directly to the PLCs.
  • Installed HMI with real-time monitoring and historical trending capabilities.
  • Installed fence line monitoring system capable of detecting combustible gas in the ppm (parts per million) range.
  • Installed new fire, combustible gas, and toxic gas detection systems.
  • Installed a SCADA system to tie everything together and provide operators with remote paging whenever they were away from their operator stations.
  • Provided detailed electrical drawings including:
    • PLC drawings
    • Interconnection drawings
    • Motor control drawings
    • Networking drawing

Results

  • Increased product quality.
  • More productive employees.
  • More reliable equipment.
  • Better able to document environmental compliance.

Details

Client: Venoco, Inc.
Location: Beverly Hills, CA

PLCs:
  • (2) DirectLogic D2-260
  • 192 discrete, 82 analog
HMIs:
  • (2) SCADA nodes - Wonderware InTouch 9.5
  • 850 tagnames
Remote Alarming:
  • Wonderware SCADAlarm 6.0 (to operator pagers)
Data Historian:
  • Custom Visual Basic application (provided by others) inserts essential data into a Microsoft Access database
Other Components Integrated through SCADA:
  • ABB RTU - TotalFlow gas chromatograph data
  • ABB TotalFlow - 6713 flow meter
  • Meteorological Station
  • Notifier - fire alarm panel
  • SCADApack - Daniels gas chromatograph data
  • Security Camera (web enabled)
  • Variable Speed Drives
  • Windows 2003 Server, mirrored hard-drives, with RAID-1 protection
Networking, Protocols, and Drivers:
  • Modbus RTU
  • TCP/IP
  • EIA-568A
  • RS-232
  • RS-485
  • DSData (OPC and DDE communication driver)